Is your innovation funnel an innovation fizzle?

2022-02-03 holly cumminsinnovation

World-changing ideas don’t seem normal and sensible – at first. They usally teeter somewhere between ‘impossible’ and ‘idiotic’. Take IBM’s Jeopardy-winning Watson system. I’ve seen a few different accounts of its creation, but I like the one shared with me by a friend who was there. An IBM VP, Charles Lickel, noticed everyone in a restaurant stand up and move to the the bar. What were they doing? What could be so interesting, in a restaurant bar? It turns out the bar had a TV, and they all wanted to watch the reigning champion of Jeopardy continue his winning streak. Lickel had an idea – IBM Research should build a computer which could play Jeopardy as well as a champion. His colleagues were more alarmed than impressed; the scientific consensus was that it was far too hard, and even trying verged on folly. Everyone knew that computers couldn’t handle puns, or humour, or allusions and indirection, much less all at the same time. There were mutterings that the old man had lost it. The happy ending to the story is that one scientist, David Ferrucci, stepped forward and said he thought he could do it – and succeeded. Victory was far from guaranteed, though: even once it was underway, the Watson project was subject to much ridicule from its competitors and even within IBM.

We see similar patterns of dismissal and ridicule for other significant inventions. When laptops were introduced, the New York Times questioned whether anybody would actually want to use a computer outside of work. They concluded “the microcomputer industry has assumed that everyone would love to have a keyboard grafted on as an extension of their fingers. It just is not so.” Even cheeseburgers were dismissed as “a bizarre combination of beef and cheese” when they were introduced. This isn’t because the journalists were stupid, it was because, at the time, portable computers or melted-cheese-on-a-beef-patty genuinely seemed like terrible ideas. I can’t even comprehend not liking cheeseburgers, but there we are.

a cheeseburger

How does an organisation distinguish between truly idiotic ideas, and those which are just uncomfortably new? The standard answer is “build an MVP”. Sadly, as a term, MVP no longer means all that much. In 2022, it seems everything is an MVP. Some of these MVPs are experiments, some are prototypes, and some are just first releases. Some are £12 million “first releases”, developed by a waterfall process (true, sad, story). Because “MVP” can be used to mean very different things, when we say “MVP”, it’s important to be explicit about what we’re trying to accomplish.

What we should be trying to accomplish depends a lot on the context. (Cynefin can be a useful framework here.) In environments of high uncertainty, sinking £12 million into a first release before getting feedback is an atrocious idea. (I’m assuming there must be some environments where the uncertainty is low enough that spending £12 million before getting feedback is a good idea, although I haven’t to confess I haven’t encountered any of them myself.)

If uncertainty is high, we should start with an experiment. A small experiment. The focus here must be on learning, not on building or re-use. By definition, when we do an experiment, we don’t know what the answer will be. This means there needs to be a strong focus on metrics, and they have to be metrics which guide decisions, and not vanity metrics. We mustn’t formulate a hypothesis and then cherry-pick evidence which confirms our favoured theory. An experiment must be designed so that failure is possible, and possibly even desirable. A failed experiment is a good thing, as long as the experiment was small; we learned something quickly and cheaply which will prevent an expensive and slow mistake.

a set of calipers

What happens if the results of an experiment aren’t what we expected (“failure”)? We adjust course. If the results are what we hoped for, we then go on to design a follow-on experiment which checks out our next risk. Eventually, if we do enough experiments, we will have moved from a situation of high uncertainty to one of moderate uncertainty.

At this point, experiments aren’t needed any more and we can shift our development technique to one which involves more, well … development. Our focus changes from learning to user value. What we’re delivering should be a product, something our audience can benefit from. That means we need to meet minimum standards for functionality (there has to be enough) and quality (bugs annoy users). “Minimum standard for functionality” doesn’t mean a product has to be feature complete. Users will tolerate missing features, especially if they can see that new capabilities are being rolled out regularly, and the product team is responsive to feedback. Here, “regularly” means “every few days” or “every week”, not “once a quarter”. Spacing releases out too infrequently can lead to value sitting on the shelf (bad) and half-baked features being rushed into a release to meet the deadline (worse). Continuous deployment is a key enabling technique here.

a steel joist

Getting a radically descoped product out into the field will allow development teams to prioritise features more effectively. Often, what we think our users want ends up being pretty different to what they actually want. You might be surprised how much can be descoped. The founder of Zappos famously descoped “actually having inventory” and “wholesaler relationships” when he started selling shoes. Instead, he would fulfill orders by going out to his local shoe shops and buying shoes. It’s not quite the same scale, but my team in the IBM Garage replaced a wholly manual ordering process with a web app … which sent an email to a seller under the covers. The client wasn’t sure if their users would feel comfortable ordering construction supplies online rather than over the phone, so the hollowed-out app allowed them to explore real-world user behaviour, and give real value to users, all for a modest investment. The app-to-email sales process was not particularly efficient on the fulfilment side, and it was not sustainable long-term, but that’s ok. Delivering a partial app allowed the team to get consumer buy-in and gather user feedback while continuing to build up function.

an email to a seller listing rolled steel joists

This type of MVP is known as a wizard of Oz MVP; it looks like a proper product, but under the surface there are smoke and mirrors and gophers pedaling frantically.

Dorothy, the lion, and the tin man approaching a curtain

This idea of using experiments to prune out bad ideas early seems logical, but it’s something organisations can struggle with. In many cultures, it’s safe to say that “designing for failure” is not encouraged. Teams working on an idea have an incentive to prove that the original idea was great, and the implementation is successful. This means there is little motivation to build in the kinds of experiments and learning which could lead to a project being cancelled. This can cause an “innovation railroad”, where projects, once funded, are pushed right through until the end. This doesn’t mean the projects succeed, it just means failure is deferred and more resources are consumed before the failure is discovered. The sunk cost fallacy can also contribute to innovation railroads.

a diagram showing an innovation railroad, funnel, and fizzle

Another anti-pattern I see is the innovation fizzle. I heard recently about a government organisation who sent several dozen staff to a two day design thinking workshop. They were energised and creative and came up with pages of great innovation ideas. And then … nothing happened. Six months later, there was still nothing. Probably, not all of the ideas should have been built, but some of them should have been explored futher. In an innovation fizzle, ideas are generated, prototypes are written, annual appraisals are submitted describing all the innovation activity … but nothing makes it into the hands of real users. Although there is an innovation budget, sometimes a very healthy innovation budget, there doesn’t seem to be a meaningful path to production out from the innovation team. This isn’t laziness; it can be genuinely hard to push over the hump from “risk-free PoC” to “project living and breathing out in prod where users may get annoyed and security breaches may happen.” In an innovation fizzle, nobody makes a conscious decision not to proceed – it just … doesn’t happen.

Is there a healthy medium between “everything gets shipped no matter what” and “nothing gets shipped?” In principle, yes: the innovation funnel. Ideas are evaluated, the weak ideas fail-out fast, and the strong ideas continue on to production. But even properly funnel-shaped innovation funnels are not perfect. The evaluation stage of the funnel can be bureaucracy-heavy and focussed on error-prevention. For one industrial company, the process of investing in a new development took a hundred distinct steps. In others, teams spend significant admin effort working through approvals and generating polished proposals. Evaluation boards want to pick winners, and this can lead to them favouring safe bets rather than riskier, more innovative, ideas.

a pair of pruning shears

The focus of innovation gates should be on enriching ideas, and gathering real, external, feedback, rather than internal evaluations and paperwork. In part 1 of this blog, I told the story of George Washington Carver. Although Carver was an enormously successful inventor and educator, he didn’t get everything right. When he first started working with farmers in the south, he printed brochures advising them to buy a second horse so they could run a two-horse plough, allowing them to till the exhausted soil more deeply. While this undoubtedly would have improved cotton yields, it was hopelessly impractical advice for tenant farmers on the edge of starvation. Once he worked out the underpinning economic issues, Carver was able to switch tack and focus his educational efforts on composting (free!), swamp muck fertilizer (squelchy, but free!), and crop rotation (sort-of-free).

a pair of horses pulling a plough

Real field feedback is intuitively more accurate than paper-based or hypothetical feedback. Surprisingly, it can also be less expensive. Unilever launched four Peperami variations concurrently in 2004, in a sort of sell-off-sales-competition. In the end, three of the variations had disappointing sales and were cancelled, but this wasn’t a failure. Experimenting in the actual market reportedly cost £1 million less than Uniliver’s traditional, protracted, focus-group method of product evaluation. It also got the winning product, Peperami Firesticks, to market a year earlier than it would have otherwise done.

It’s a fact of life that innovation isn’t always going to work. Thomas Edison famously said “I have not failed 10,000 times—I’ve successfully found 10,000 ways that will not work.” Peperami Firesticks were a success, but Peperami Canniballs, Dunkers, and Sarni, launched at the same time, were not. Besides his tone-deaf horse suggestions, other notable Carver failures include peanut bread, peanut sausage, peanut coffee, peanut facecream, and peanut nitroglycerine. (They all “worked”, in some technical sense, but it turned out no one wanted peanut coffee in 1916.)

For innovation to flourish, these setbacks have to be tolerated. In fact, these setbacks have to be positively encouraged, as part of maximising learning. Innovation does not work in a culture of fear. Psychological safety is an essential foundation which allows teams to report failure and iterate continuously. The best part is that the ingredients for successful innovation - psychological safety, continuous delivery, short feedback cycles, and an emphasis on learning - are more generally the ingredients for a successful business. Everyone wins.

a lightbulb